Application procedures
Test Certification
Required documents
Documents required for application with submission of applied equipment
Documents required for application with the characteristics test results (without submission of applied equipment)
Notice for application
- Number of copies of application documents to be submitted: One each
- Application form
When a corporation or an organization applies for the certification, the applicant must be its representative. However seal impression or signature of the responsible person is required.
When the application arrangement is entrusted to the other party, a letter of attorney from the responsible person of applicant to the responsible person of mandatary is required. In this case, seal impressions or signatures of the responsible persons of both applicant and mandatary are necessary.
- Submission of applied equipment
Place of the submission of the applied equipment is TELEC office in principle.
- Attachments for the test
TELEC may request applicant to submit attachments for enabling smooth connection between applied equipment and measuring instruments.
- Quantity limitation
For the test certification, the maximum quantity is 500 sets per one application.
Examination and characteristics test
When radio equipment is submitted;
- Examination of type specifications
TELEC examines whether descriptions in type specifications and system diagrams for the radio equipment conform to the requirements of the Radio Act.
- Examination by comparison check
TELEC examines whether the submitted radio equipment conforms to descriptions in the submitted documents as well as the compliance with the Radio Act.
- Characteristics test
TELEC performs the characteristics test under the condition of ordinary temperature (20° ± 15°) and ordinary relative humidity (65% ± 15%) by supplying the rated power supply voltage to the equipment and examines whether the test results conform to the technical standards. The characteristics test items are listed on the site.
- Number of sampling units
The following tables show the number of sampling units for the test certification.
Table 3-1 : Number of sampling units
Number of units applied |
Number of sampling units |
Subject radio equipment |
1 to 2 |
All units
|
Cordless telephone
Specified low-power radio equipment
Low-power security radio
Digital cordless telephone
PHS land mobile station
Mobile station for DSRC system |
3 to 15 |
2 |
16 to 25 |
2 |
26 to 50 |
3 |
51 to 90 |
5 |
91 to 150 |
8 |
151 to 280 |
13 |
281 to 500 |
20 |
DSRC: Dedicated Short Range Communication
Table 3-2: Number of sampling units
Number of units applied |
Number of sampling units |
Subject radio equipment |
1 to 3 |
All units |
Other than radio equipment in Table 3-1 |
4 to 15 |
3 |
16 to 25 |
5 |
26 to 50 |
8 |
51 to 90 |
13 |
91 to 150 |
20 |
151 to 280 |
32 |
281 to 500 |
50 |
When data of characteristics test results is submitted;
- Examination of type specifications
TELEC examines whether the descriptions in type specifications and system diagrams for the radio equipment conform to the requirement of the Radio Act.
- Examination by comparison check
TELEC examines whether photographs or drawings showing the component layout and the external view conform to the type specifications and the system diagrams for the radio equipment. At the same time, TELEC examines whether the submitted documents comply with the Radio Act.
- Examination of the data of characteristics test results
TELEC examines whether;
a) The test items and the test results comply with the technical standards,
b) Appropriate measuring instruments have been used for the characteristics test and the measuring instruments have properly been calibrated, and
c) The person who conducted the measurement complies with any of the following qualifications.
> Engineer of certification body that has ISO17025
> Engineer of applicant or manufacturer that has ISO9001
Type Certification
Required documents
Documents required for application with submission of applied equipment
Documents required for application with the characteristics test results (without submission of applied equipment)
Notice for application
- Number of copies of application documents to be submitted: One each
- Application form
When a corporation or an organization applies for the certification, the applicant must be its representative. However seal impression or signature of the responsible person is required.
When the application arrangement is entrusted to other party, a letter of attorney from the responsible person of applicant to the responsible person of mandatary is required. In this case, it is necessary to put seal impressions or signatures of the responsible persons of both applicant and mandatary.
- Submission of applied equipment
Place of the submission of the applied equipment is TELEC office in principle.
- Attachments for test
TELEC may request applicant to submit attachments for enabling smooth connection between applied equipment and measuring instruments.
Notes: TELEC may request the applicant to submit additional documents.
Examination and characteristics test
Examination of type specifications
TELEC examines submitted type specifications, block diagrams and attached documents etc. to judge whether the construction type of radio equipment conforms to the technical standards.
Examination by comparison check
TELEC examines whether applied equipment conforms to descriptions in the submitted documents as well as the compliance with the Radio Act.
- When applied equipment is submitted;
The examination is conducted by comparison check between "the submitted equipment" and "the descriptions in type specifications and block diagrams etc." or between "photographs or drawings showing the component layout and the outside view" and "the descriptions in type specifications and block diagrams etc".
- When applied equipment is not submitted;
The examination is conducted by comparison check between "photographs or drawings showing the component layout and the outside view" and "the descriptions in type specifications and block diagrams etc.".
Examination of characteristics test results
- When applied equipment is submitted;
TELEC conducts the characteristics test to judge whether the characteristics of applied equipment conform to the technical standards.
- When applied equipment is not submitted;
TELEC examines whether;
- a) The test items and the test results comply with the technical standards,
- b) Appropriate measuring instruments have been used for the characteristics test and the measuring instruments have properly been calibrated, and
- c) The person who conducted the measurement complies with both of the following qualifications.
- > Engineer of certification body that has ISO17025
- > Engineer of applicant or manufacturer that has ISO9001
Examination of conformity of applied equipment
- When applied equipment is submitted;
TELEC examines submitted statement of verification method, type specifications, attached documents and test results, whether it is ensured that all of the applied radio equipment manufactured according to the submitted type specifications conform to the type specifications.
- When applied equipment is not submitted;
TELEC examines submitted statement of verification method, type specifications, attached documents, characteristics test results and photographs or drawings showing component layout and outside view, whether it is ensured that all of the applied radio equipment manufactured according to the submitted type specifications conform to the type specifications.
Result of certification
Issue of certificate
TELEC issues a certificate to the applicant whose equipment has successfully passed all of the examinations. The number of certificate is one for each application in principle.
Notification of examination result
In principle, the notification of examination result will be made within 15 days from the receipt date of application for type certification and 7 days for test certification. These days exclude those for correction of application documents and holidays.
Certification mark
For the certification mark, it is regulated as follows;
> Certification label shall be affixed to an easily recognizable place on the certified equipment.
> In case of test certification, registered certification body shall affix a certification label to each of the certified equipment.
> In case of type certification, an applicant may make certification labels and affix the labels to the radio equipment when all of the requirements under the Radio Act are satisfied as the results of inspection. Since TELEC can make the type certification labels, please submit the application form for it when required.
Obligations to conform to construction type
Obligations to Conform to Construction Types, etc. under Radio Act
Issued by Registered Certification Body Council
A person who has received type certification from a registered certification body undertakes the obligation to conform to certified construction type under the Radio Act when the person deals with the specified radio equipment.
Registered Certification Body Council provides brief explanation on the system of "obligation to conform to construction types, etc." as mentioned below for the persons who have been granted construction type certification and the persons concerned.
1: Obligations to Conform to Construction Types, etc.
For the obligation, paragraph 1 of Article 38 - 25 of Radio Act provides as follows; A person who has received construction type certification (hereinafter referred to as a "certified dealer") from registered certification body shall, when dealing in specified radio equipment based on the construction type pertaining to said construction type certification (hereinafter referred to as a "certified construction type") ensure that said specified radio equipment conforms to said certified construction type.
Further there is the following provision in the paragraph 2;
A certified dealer shall inspect specified radio equipment that it deals in under the preceding paragraph , in accordance with the method for verification pertaining to the construction type certification, and prepare and maintain the inspection records pursuant to the provisions of the applicable MIC ordinance.
Items to be recorded in the inspection record are specified as follows in Article 19 of "Obligations concerning Technical Regulations Conformity Certification of Specified Radio Equipment" (hereinafter "Certification Ordinance").
- Certification number of construction type
- Date and place of inspection
- Name of responsible person for inspection
- Quantity of specified radio equipment inspected
- Inspection method
- Inspection result
It is obligated to maintain the inspection record for ten years from the date of the inspection. The inspection record may be stored by an electromagnetic means. However, in this case, it is required to immediately display the record using a personal computer etc.
2: Mark for specified radio equipment based on certified construction type
As for the mark, Article 38-26 Radio Act provides as follows;
A certified dealer may, upon performing the obligations pursuant to the provisions of paragraph (2) of the preceding article (Article 38 - 25 of Radio Act) with regard to specified radio equipment based on a certified construction type, affix to said specified radio equipment the mark specified by the applicable MIC ordinance.
When a certified dealer violates the provision of paragraph (2) of the preceding article (Article 38 - 25 of Radio Act), the dealer may be prohibited from affixing the mark to the certified radio equipment by paragraph (2) of Article 38- 28 of Radio Act.
Further Article 20 of Certification Ordinance regulates that the mark shall be made in accordance with the applicable MIC ordinance (Form 7 of Certification Ordinance) and affixed to an easily recognizable place of the specified radio equipment.
3: Penalty for violence of provisions on "obligations to conform to construction type"
There are penal provisions for the violence of provisions on obligations to conform to construction type". Penalties are provided in Article 114 of Radio Act and a fine not exceeding one hundred million yen imposed in accordance with the provisions.
The following items are included in the penal provisions.
- When a certified dealer violates a prohibition provision on the marks;
- When a certified dealer affixes a mistakable mark;
[For reference]
- The "certification of construction type" is to certify that the specified radio equipment conforms to the technical standards by examining the construction type including the design drawing etc. and the method of quality management for the radio equipment. Further the quality management system is examined to ensure that all of the specified radio equipments are properly manufactured in accordance with the design drawings.
- The registered certification body council is a voluntary organization aimed to smoothly operate the technical regulations conformity certification and secure the convenience for radio wave users. The conference is constituted of all the registered certification bodies.
Charges
Contact the address below.
Contact for application
Fax |
+81-3-3799-8328 |
Address |
5-7-2, Yashio, Shinagawa-ku, Tokyo, 140-0003 Japan
Testing Department |
Please do not hesitate to contact us if you require advice or assistance.